Washington Evening Journal
111 North Marion Avenue
Washington, IA 52353
319-653-2191
Road work to be on west end of old highway Tuesday
Norris Asphalt Paving of Ottumwa plans to begin the surface course of hot mix asphalt Tuesday, weather permitting.
Work will begin on West Burlington Avenue/Business 34 at Ninth Street and proceed west.
The Iowa Department of Transportation asks drivers to avoid using West Burlington Avenue/Business 34 in the area as much as possible.
The asphalt surface will need to cool completely before traffic can be allowed back
N/A
Sep. 30, 2018 7:40 pm
Norris Asphalt Paving of Ottumwa plans to begin the surface course of hot mix asphalt Tuesday, weather permitting.
Work will begin on West Burlington Avenue/Business 34 at Ninth Street and proceed west.
The Iowa Department of Transportation asks drivers to avoid using West Burlington Avenue/Business 34 in the area as much as possible.
The asphalt surface will need to cool completely before traffic can be allowed back on it to assure the best driving surface possible.
Businesses will remain open and can be accessed by using alternate routes.
For this news brief, see the Monday, July 13, 2009, printed edition of The Fairfield Ledger.